Order description

In order to increase the capacity of the storage of liquid ammoniac which is under pressure pipeline system installation was planned. A pipe bridge was installed in order to integrate the new ball-tank with the existing storage tank. Elements of the tank and pipe bridge as well as the surface geometry were specified. 3D-PDS planning was conducted for pipeline technology planning and the results were presented in Design Review. That way the customer was enabled to get the idea of how the new part will be implemented into the existing environment. In order to conduct functionality test of that system, the detail engineering for the EMSR was applied in the same company. The list of achievements was created together with planning results, which are used for tenders, for gathering tender documentations and offers. During realization phase all construction management requirements have been fulfilled.

3D - PDS Planning

- Pipeline design and equipment layout plan by EQP Tools, Frameworks and Piping-Design - Review by using Smart Plant Review
- Process Equipment Design
- R&I image processing
- Safety Report updating
- Safety Integrity Level rising

Features

- The length of stainless steel pipes, C-steel and steel low temperature is about 650 m
- Isometrics with ISOGEN
- About 50 EMSR with connecting to the fail safe SPS
- Specification of approx. 20 separate parts
- Circle diameter 10.5 m
- Release in the closed system
- Connecting the pipe bridge to the given system
- System according to PED and VAwS
|